Hi, Welcome to our website.


In the electronic assembly workshop in Shijing, Bao´an, at 3 a.m., an abnormal noise suddenly came from the workshop - the rapid door, which was running at high speed, suddenly got stuck in mid-air. The SMT materials that were about to be transferred beside the conveyor belt were forcibly stopped at both ends. The clean air flow in the constant temperature workshop rushed out through the door gap. In the logistics transfer warehouse in Songgang, during the morning rush hour, trucks formed long queues. The rapid door motor suddenly "failed", and the loading and unloading process that usually took 1 minute was blocked for more than 20 minutes. The loading and unloading team leader was sweating profusely... The motor failure of the rapid door in the workshop is never a minor issue: a 10-minute stop could disrupt the production rhythm of the entire production line, a 30-minute jam could cause the temperature and humidity in the constant temperature workshop to exceed the standard, triggering a quality rate warning, not to mention the failure of the rapid door in the industrial dust-proof workshop and the cold chain storage area, which could cause tens of thousands of materials to be lost in a minute.